Theory of Constraints (TOC) Accounting and Measurements Discussions
This web site provides partial archives for the TOC-L/Goldratt/APICS
CMSIG discussion forum as it relates to measurement and accounting issues.
Last updated: 2001-11-28.
|
New to TOC?
|
If you are a newcomer to the Theory of Constraints
(TOC), you will probably also want to visit the Iowa State University CIRAS (Center
for Industrial Research and Support) TOC website maintained by Tim
Sullivan for a very understandable, but sound, introduction to TOC and the Crazy About Constraints! web site for
general information.
|
|
Best Pick
|
Course materials for the Constraints Accounting and POOGI
Bonus Seminars are being made available on a limited basis. See the announcement on the Constraint Accounting Measurements
Homepage for details.
For an introduction to accounting measurements and
techniques for use with a Theory of Constraints implementation: Thomas Corbett, Throughput Accounting,
North River Press (1998).
|
|

|
NOTICE: The TOC discussion list is now being hosted by APICS.
Since an archive by thread is provided by APICS, this page is no longer
necessary as an archive. Thus I will no longer attempt to maintain all
threads of lasting interest, but rather will attempt to do a better job of
capturing the measurement and accounting aspects of the discussions.
John
Caspari, 12-13-97
|
These postings are not comprehensive and significant editorial judgment has
been exercised. Specifically excluded are copyrighted postings, items that I
know to be available elsewhere on the net, items that duplicate previous
discussions, and items with a limited time horizon.
Where postings quote previous postings, the quote is shown in italics.
The following topics are currently available (Dates are approximate time of
last addition to this page).
- 98-12-11 ABC
(Activity Based Costing) -- Fundamentally Flawed?
- 97-09-01 Activity
Based Costing (ABC)
- 98-12-11 Activity
Based Costing (ABC) Generic Cloud
- 96-12-27 Actual
Experiences
- 96-12-27 Agile
Manufacturing
- 97-01-25 Allocation
- 96-10-27 Balanced
Scorecard
- 96-11-29 Bayesian
Networks
- 97-09-01 Benchmarking
- 98-12-11 Budget Scheduling
Period: See Budgeting and Buffers
- 98-12-11 Budgeting
and Buffers
- 96-07-17 Buffers
- 00-00-00 Case Studies:
96-10-17 A Laboratory for the Repair of Communication
equipment
97-01-25 Household Management
- 96-08-20 Categories
of Legitimate Reservation
- 97-09-01 CEO's
conflict (people vs costs)
- 96-10-18 Change
Process (Includes subjects: managing change, TOC launch advice,
resistance to change)
- 96-12-20 Chaos
Theory, Quantum Physics and Cause-effect
- 97-02-01 Common
Causes and Special Causes
- 98-12-25 Compensation/Reward
Systems
- 97-05-11 Constraint
Based Costing System
- 97-05-11 Constraints
Accounting
- 97-02-16 Core
Problem Cause and Effect
- 97-09-01 Core
Problem vs Constraint: is there a difference?
- 96-03-03 Cost
Reduction Mentality Discussion of the Cost World and why we focus on
cost rather than throughput.
- 97-10-17 Critical
Chains (See also Projects: capacity and bottlenecks)
- 96-07-23 Creating
Shareholder Value
- 97-03-04 Cults
and Chupchiks
- 97-03-09 Customer
UDE’s in Dry Cleaning
- 96-04-15 Departmental
Throughput?
- 96-08-20 Dice
Game
- 96-03-04 Drum-Buffer-Rope
(BBR) Scheduling
- 96-09-19 Economic
Value Added (EVA)
- 96-11-29 Education,
K-12 (and kids alternative education)
- 96-09-16 Employee
Empowerment (originally 'Hmm!')
- 96-12-15 ERP
System features that support TOC
- 97-02-16 Evaporating
Cloud
- Examples of
use of TOC Thinking Processes
96-08-22 Training at Branch Locations
- 96-10-17 Fifth
Discipline & TOC (includes Causal Loop Diagrams)
- 96-09-04 Five
Steps (of the TOC Focusing Process) -- Modifications
- 97-01-25 Flowcharting
(Drawing Trees) Software, mechanics, and techniques related to drawing
and displaying thinking process (TP) trees.
- 97-05-02 FLUSH
- 96-09-16 Formal
and Informal Measurements
- 97-05-02 Genetic
Algorithm
- 96-10-27 Goals
- 96-07-23 Growth
Strategy -- Johnson Controls
- 97-03-05 Health
Care & Hospitals, TOC Applied to
- 96-06-02 I,
OE, and Depreciation
- 96-07-30 IDD
and TDD Includes subject TOC in Make to Stock Environments.
- 96-01-29 Ideas
about Throughput in NFPOs
- 00-00-00 Intuition -- see
"TP -- Can It Be Trusted?"
- 96-08-23 Impact
of Inventory on Bottom Line
- 96-12-27 Improvement
(of TOC and TP)
- 96-10-04 Injections
- 97-01-25 Interactive
constraints
- 96-05-27 Internal
Control and TOC
- 97-09-01 Inventory
& Production
- 97-03-04 Irresistible
offers
- 96-03-03 Is
the Core Problem True?
- 97-09-01 Joint
Product Costs
- 97-10-17 JIT
vs. TOC
- 96-12-15 Line
balancing
- 97-04-05 Line
Balance, TAKT TIME, and TOC
- 97-03-04 Local
Measurements See also topic IDD and TDD.
- 98-08-22 Local
measurements consistent with global constraints
- 97-09-10 Make
Vs. Buy
- 97-10-17 Measurements/Assumptions
- 96-11-27 Minimal
Planning
- Miscellaneous
Postings (Section A). This is a category which contains postings which
have not yet received sufficient response to warrant a separate page.
96-04-02 Project management software
96-10-17 TOC and causal loop diagrams (Transferred to "Fifth
Discipline & TOC")
96-03-25 Education and the thinking processes
96-04-22 Quotes for TOC
96-03-07 What is the "customer" of a public school
96-03-07 TOC in the tile manufacturing industry
96-03-07 TOC for marketing applications
96-03-11 TOC only for top management?
96-03-07 TOC and internal IS organizations
96-03-07 IO maps and future reality; constraints within The Goal
96-03-03 Reward systems based on throughput
96-01-27 TOC and ratios
- Miscellaneous
Postings (Section B)
96-02-29 Definition of TP
96-02-24 TOC and innovation
96-02-20 TOC--what's the difference?
96-02-11 Display of time buffers
96-02-11 Goals and necessary conditions
96-02-15 Decentralized nonhierarchical systems
96-01-27 the "end of the month crunch"
96-01-27 PhD research at Cranfield University UK
- Miscellaneous
Postings (Section C).
96-07-05 Environmental applications of TOC. This thread also contains a
good deal of discussion about the appropriate use of the forum.
96-03-26 U. S. auto industry QS-9000 and TOC
- Miscellaneous
Postings (Section D)
96-05-27 TP & Socratic Method
96-05-20 Supply chain management
96-07-30 CCR (Capacity Constrained Resource)
96-07-17 TP Exercises
96-07-30 Sears and TOC
96-07-23 Suboptimization
- Miscellaneous
Postings (Section E)
96-10-28 A Glimpse of the Light
- 96-11-29 MRP2
- 97-04-05 Multi-tasking
(see also "critical chains")
- 97-02-15 Non-TOC
Equivalents
- 97-03-09 Order
Release Planning
- 96-10-17 Organizational
Learning: About Alex Rogo - "The Goal"
- 96-08-31 Organizational
Self-Similarity
- 96-08-20 Pacing
Phenomenon
- 97-01-25 Peoples'
Behavior
- 97-09-01 Performance
Metrics: Floor Space
- 97-05-02 Pricing
& Quotation
- 97-09-10 Pricing,
Marginal
- 96-10-04 Process
Management and TOC
- 96-10-27 Product
Cost -- Do you exist? See also Constraints Accounting
- 97-03-04 Product
Development: Which Product First?
- 96-09-16 Productivity
- 97-09-10 Project
Management (see also subjects: Critical Chains, Flush, Projects:
capacity and bottlenecks)
- 97-04-29 Projects:
capacity and bottlenecks (See also Critical Chains)
- 01-07-31 Ratios
(T/I and T/OE)
- 97-01-25 Relationship
UDES
- 00-00-00 Rizzo, Tony: Short
Articles. (Tony often writes short articles -- I am going to try to
collect them here.)
96-10-28 The Membrane Of The Mind
96-10-28 Giving It Away
97-01-25 Evolutionary twig
96-12-20 The Way Geese Fly
97-03-07 People as a Variable Cost
97-03-29 Home Alone
97-04-30 Postulates
- 97-03-09 Schools,
TOC for
- 97-05-11 Scrap
-- Include in T calculation?
- 97-09-01 Seasonal
Products (Ice Cream--Back to Basics & 5 focusing steps)
- 97-03-09 Service
Organizations, TOC for
- 97-03-09 Service
Organizations, TOC metrics applied to
- 97-05-02 Software
for TOC
- 97-09-10 Software
Development, TOC Applied to
- 97-09-10 Subordinating--When
it isn't your bottleneck
- 00-00-00 T, I, & OE:
Nature and Definition. See TOC & Public Service; T, I, and OE
- 97-01-06 T,
I, and OE (Includes subject: Empty What's Full)
- 96-11-29 Teleworking,
flexi-time and TOC
- 96-02-11 The
Dark Side of the UDE. Note that this category captures the subject
"TOC/TP." The nature and role of an undesirable effect (UDE) in
the current reality tree (CRT). Discussion continues into exposing goals
and necessary conditions if they have not previously been made explicit.
- 00-00-00 Throughput
Accounting: See Constraints Accounting
- 97-09-10 Throughput
Accounting in chemicals manufacturing
- 97-10-17 Throughput
Calculation -- Cost Flow Assumption
- 97-03-29 Throughput World vs. Cost World (Product Development)
- 97-03-05 Throughput/time
of constraint
- 96-06-05 TOC
in continuous process plants
- 96-09-08 TOC
in Semiconductor Manufacture
- 96-03-26 TOC--Is
it Worth the Price? Includes subject, Who is a Jonah?
- 96-01-27 TOC
& Public Service--Section A. TOC as it relates to not for profit
organizations. Also contains discussion of the nature of T, I, and OE.
- 96-07-10 TOC
& Public Service--Section B
- 96-04-08 TOC
and BPR/TQM
- 96-02-03 TOC
and Product Line Pruning
- 96-09-08 TOC
and Production - a Question (implementing TOC in local areas only)
- 96-02-16 TOC
and R&D
- 96-07-30 TOC
Applied to Personal Goals
- 96-01-28 TOC
Limits, Its application in Public Economics: note that this category captures
some material related to the structure of the TP (thinking processes) per
se. See also "The Dark Side of the UDE" for TP material.
- 97-02-01 TP
as a whole
- 96-02-11 TP
-- Can It Be Trusted? (Includes subject "Intuition") Section
A
- 96-03-03 TP
-- Can It Be Trusted? (Includes subject "Intuition") Section
B
- 97-03-05 TOC/TP
and INNOVATION
- 96-05-15 Transfer
Pricing
- 96-11-29 Uncertainty
and risk
- 96-12-15 Union
Quandry
- 96-08-20 Use
of Trees to Communicate Common Sense on Internet
- 00-00-00 Who is a Jonah? See:
TOC -- Is it Worth the Price?
- 97-02-15 Value
Added Cost
- 96-11-29 Why
[is the spread of TOC] so slow?
Go to
Constraint Accounting Measurements
homepage.
11-28-2001